Supply, installation and maintenance of a 1 000 kWh battery storage system for grid-connected and island operation

European Commission, DG Joint Research Centre (JRC), Institute for Energy and Transport

The contract mainly consists of the supply (and related services) of a battery storage system for grid-connected and island operation, respectively:
a) delivery, installation, commissioning, training (including provision of documentation) of the supply within 5 months from the date of the start of the contract;
b) 2 years' guarantee from the date of acceptance of the supply through the certificate of conformity including annual preventive maintenance;
c) 1 year of preventive and corrective maintenance, renewable up to 3 times (4-year maximum total).

Scadenza
Il termine per la ricezione delle offerte era 2014-09-29. L'appalto รจ stato pubblicato su 2014-08-06.

Chi?

Cosa?

Dove?

Storia dell'approvvigionamento
Data Documento
2014-08-06 Avviso di gara
2014-09-05 Informazioni complementari
2015-01-19 Informazioni complementari