Port Empedocle Power Palnt - Job M002 - Gas Turbine Stack
Porto Empedocle power plant - JOB M002 โ Gas turbine stack.
The job covers the supply (design, material, procurement, shop fabrication, testing, shipment to site, erection, supervision during commissioning, start-up and site tests) of nยฐ 1 self supporting steel stack for gas turbine, with following main characteristics:
โ Height 77 m,
โ Max gas temperature 550 รท 650 ยฐC,
โ Gas mass flow 800.000 kg/hr,
The scope of supply will include:
โ steel stack,
โ silencer,
โ base plate and anchor bolts,
โ stair, ladders and platform,
โ hoist,
โ warning lights,
Spare parts for commissioning and start-up are included in the scope of supply.
The following equipment, materials and services are excluded from the scope of supply:
โ Civil works,
โ CEMS.
Scadenza
Il termine per la ricezione delle offerte era 2013-05-10.
L'appalto รจ stato pubblicato su 2013-04-12.
Chi?
Cosa?
Dove?
Storia dell'approvvigionamento
Data |
Documento |
2013-04-12
|
Avviso di gara
|